Footing 1
Total length: — ft · Width: — in · Depth: — in
Strip footing quantity
Calculate concrete volume for a strip footing using total length, width, and depth.
Project
Formula
Footing volume = total length × width × depth.
Worked example
Combine separate footing runs as individual sections when their dimensions differ. The final order quantity totals them once.
Assumptions
The launch defaults are 10% waste and upward rounding to 0.25 yd³ or 0.10 m³. Open “Adjust assumptions and costs” to use your supplier’s increment, actual prices, density, truck capacity, or product bag yield.
Questions
Yes. Add a section for each distinct width or depth.
No. It calculates from the dimensions you provide.
US footing widths and depths are commonly measured in inches while total runs are measured in feet.
Related tools
Concrete bag calculator · Ready-mix vs. bags · Concrete cost calculator
Bag yields follow the cited manufacturer data. See sources and review dates.