Slab 1
Length: — ft · Width: — ft · Thickness: — in
Premixed bag estimator
See 40, 50, 60, and 80 lb bag counts at the same time, rounded up with waste included.
Project
Formula
Bag count = concrete volume with waste ÷ published yield per bag, rounded up to a whole bag.
Worked example
ConcreteQty uses the published QUIKRETE Concrete Mix yields: 0.30, 0.375, 0.45, and 0.60 ft³ for 40, 50, 60, and 80 lb bags.
Assumptions
The launch defaults are 10% waste and upward rounding to 0.25 yd³ or 0.10 m³. Open “Adjust assumptions and costs” to use your supplier’s increment, actual prices, density, truck capacity, or product bag yield.
Questions
Always. A partial bag becomes one whole bag.
Yes. Open assumptions and costs to enter the price for each bag size.
No. Check the product label and adjust planning when the product differs from the cited yield.
Related tools
Concrete bag calculator · Ready-mix vs. bags · Concrete cost calculator
Bag yields follow the cited manufacturer data. See sources and review dates.