All-in-one concrete planner

Concrete Calculator

Calculate slabs, post holes, footings, walls, columns, bag counts, waste, and an order-ready quantity.

Project

LENGTHWIDTHTHICKNESS

Formula

Add each shape, then round once

Volume = measured area × concrete thickness, or the matching cylinder or prism for the other shapes. ConcreteQty converts the combined result to cubic yards, then applies waste and supplier rounding once to the total.

Common mistake

Averaging a slab with a footing

A 4-inch slab and an 8-inch footing do not share a thickness. Put them in separate sections. The planner adds the finished volumes and applies the allowance once, instead of hiding the extra concrete inside an average depth.

Worked quantities

Six different shapes, one ordering method

Each row is one section. The measured yardage, the order after 10% waste and 0.25 yd³ rounding, and the 80 lb bag count all come from the same engine as the form above.

Mixed shapes are totaled before rounding. Do not round each shape and then add the order numbers.
JobMeasured yd³Order yd³80 lb bags
12 × 10 ft slab, 4 in1.481.7574
4 post holes, 12 in × 3 ft0.350.5018
30 ft footing, 16 × 8 in0.991.2549
20 × 8 ft wall, 8 in thick3.954.50196
2 round columns, 12 in × 8 ft0.470.7524
3 tubes, 12 in × 4 ft fill0.350.5018

Field check

Split unlike sections

Keep sections separate when their thickness, shape, or units differ. The planner totals the finished concrete once, so a slab, footing, and post-hole run can share one purchasing result without averaging their dimensions.

Field check

Measure the concrete, not the work area

Use the final inside dimensions that concrete will occupy. Excavation, form lumber, gravel base, and overdig are different quantities and should not be folded into the concrete dimensions.

Field check

Recheck the order number

The calculated volume, waste allowance, and supplier rounding are shown separately. Confirm the final increment and minimum order with the supplier before treating the displayed order quantity as a purchase instruction.

Questions

What the all-in-one planner answers

Does the result include waste?

Yes. The default is 10%, and the calculated volume remains visible separately.

Can I combine several pours?

Yes. Add sections for slabs, footings, walls, post holes, or columns and ConcreteQty totals them.

Does this design the concrete structure?

No. It calculates quantity and purchasing estimates only.

Bag yields follow the cited manufacturer data. See sources and review dates.